Deployed 7/17/20-9/1/20 CANON: Ran Canyon Run line multiple times stopping at C1 for cross-over data, visited CPFBOG03 site, ran trianguloid 7/17-8/3 Navigated to Station M on 8/4 and arrived 8/7, CO2 and CTD data stopped functioning on 8/9. Eco-puck and MET pressure sensor stopped working 8/14 Made its way back to Monterey Bay slowly starting 8/15 (strong southward current). MET pressure data stopped working 8/14, recovered 8/19 and stopped again 8/22. Helped wtih LRAUV testing at Portuguese Ledge on 9/1 before recovery. Tag detected by VR2C on 8/5: #1996